Linnorm draugen7/4/2023 ![]() It has not least sought to increase the pace of production drilling on these and other mature fields. In seeking to slow the decline in oil output and maintain overall production at today’s level until 2020, Petoro has devoted particular work to Gullfaks, Snorre and Heidrun. Securing value in and close to the big mature fields nevertheless represents the top priority in the company’s strategy. In addition come a number of smaller developments. The drilling module on Draugen is constructed and built by Hitec Dreco. It was decided in January 1997 to dispense with the maintenance-intensive drilling package on the Draugen platform because the well programme had been completed. In early 2013, the Skrugard licence resolved that a subsequent development of the Skrugard/Havis discoveries would be based on a floating platform and subsea installations, plus an oil pipeline to Eidnes in Nordkapp local authority.ĭevelopment of Skrugard/Havis in the Barents Sea, Linnorm and the Polarled pipeline in the Norwegian Sea and Johan Sverdrup in the North Sea are examples of major projects with Petoro involvement in all parts of the NCS. person Finn Harald Sandberg, Norwegian Petroleum Museum. Agreement was also reached with Iceland before Christmas 2012 on interests in two licences in the Dreki area of the Icelandic sector on the Jan Mayen Ridge. 50 kilometres northwest of Shell's Draugen field, in a water depth of 300. The company is involved in fields and projects in all three provinces on the NCS – the North, Norwegian and Barents Seas. French supermajor searching for buyers for its 20 stake in Shell’s 1.8 billion Linnorm project offshore Norway. The number of licences has increased from 80 when the company was founded in 2001 to 158 at the end of 2012. Petoro follows up the state’s interests in production licences and other partnerships.
0 Comments
Leave a Reply. |